Grant Description
The purpose of the Soil Erosion and Drainage Law Compliance Program (SEDLCP) is to restore and protect surface water quality, particularly Impaired Waters, and to supplement local efforts to sustain clean water in Minnesota, by applying existing soil erosion reduction and drainage ditch statutes and associated rules.
Reporting Overview
The required match percentage varies based on the subgrant program. The 2014 Drainage Ditch Inventory and Inspection and Soil Erosion subgrant programs require a 25% match; the 2014 Redetermination of Benefits and Drainage Ditch Buffer Strips subgrant program requires a 50% match.
A workplan must be approved before work can begin on this grant. The workplan should be developed in eLINK using the activities proposed in the application, although BWSR may require additional details at this stage. The workplan will lock upon submittal to BWSR for approval, preventing edits to the approved budget but allowing you to enter expenses and reporting details as work is completed.
Grant recipients are required to report on grant outcomes, activities, and accomplishments in eLINK according to the requirements outlined in the grant agreement and policies within BWSR’s Grants Administration Manual. Clean Water Fund grant agreements stipulate that the grantee must “comply with requirements for project signage.” The logo may be displayed on legacy-funded construction projects; at access points to any land or water resources restored, protected, or enhanced through Legacy funds; or on printed and other materials funded with money from one or more of the funds. The Legacy logo should be prominently displayed on the grantee’s website.
Attribute |
Details |
---|---|
Program Policy |
Clean Water Fund – Subject to all CWF requirements, including use of the Legacy logo. |
Administered By |
BWSR |
Application Completed in eLINK |
Yes |
Proposed Indicators in Application |
No |
Grant Agreement Distributed Through eLINK |
Yes |
Exempt from eLINK Reporting |
No |
Additional Report Attachment |
No |
Non-eLINK Reporting Required |
No |
Workplan |
Yes |
Match Requirement |
25% for 2014 Soil Erosion and 2014 Drainage Ditch Inventory and Inspection; |
Activity Details (Practices & Indicators) |
No |
Mapping |
No |
Rates & Hours |
Yes – use this tool in eLINK to calculate Full Time Equivalent employees funded through the grant |
Expenses |
Yes |
Actual Results |
Yes |
Payment Schedule |
50/40/10 |